TACMIN SERVICE OFFERING SUMMARY |
|
COMPREHENSIVE EXPLORATION & OREBODY EVALUATION
To determine the "Measured and Indicated" resource and "Proven and Probable" mineral reserve for in depth analysis of the worth of the orebody to justify project implementation.
Computerization of geological data
Computerized 3D ore body modeling
Evaluation of ore reserves
Verification of ore reserves
Pit optimisation
DETAILED MINING METHOD
To conduct an in depth analysis of a limited number of alternative mining methods and justify the selection of the optimal method of implementation.
Optimum mining plan and layout
Optimum mining equipment requirements, sizing and specifications
Equipment production simulations where appropriate
Manpower requirements for mining
Production schedules
Risk assessment of mining option
MINING TYPE (CONTRACTOR VS OWNER OPERATOR)
To conduct an in depth analysis of Owner Operator- versus Contract Mining.
Contract mining enquiry
Contract mining cost estimates from first principals for benchmarking purposes
Contract mining tenders and specifications
Shadow Bids
DETAILED METALLURGICAL PROCESSING METHOD
To conduct an in depth analysis of a limited number of alternative metallurgical processes and justify the selection of the optimal process for implementation.
Ore grade scheduling and blending method to achieve the desired feed grade
SITE INFRASTRUCTURE AND LOGISTICS
To conduct and in depth evaluation of the site to identify and justify the selection of the infrastructure required, gaining access to and servicing the project.
Mining layout and related route selection and designs
ENGINEERING DESIGN
To complete the basis engineering design of the selected mining method, metallurgical process and service infrastructure required to implement the project. (eng +- 10 - 15% complete)
Major equipment sized and specified for tender purposes.
Major spares listing and assumptions
Maintenance strategy
HUMAN RESOURCES
To provide the basis for the managing and controlling of the implementation of the project.
To propose an organogram and manpower requirements to enable adequate information for budgeting, recruiting and appointing human resources for the implementation and operational phases.
Operational management for mining operations and maintenance
× AUTHORISATION AND PERMITS
To conduct an in depth analysis of authorisations and permits required from the Regulators and Authorities to enable implementation once approval for the project has been obtained.
PROJECT IMPLEMENTATION PLANNING AND SCHEDULING
To develop an in depth analysis and schedule of activities required for implementing the project with a detail proposal of the timing, sequencing and duration of them until post commissioning.
Detailed breakdown and scheduling of engineering activities
Identify contract types and procurement strategy for mining phases
× LEGAL AND FISCAL AGREEMENTS
To complete detailed negotiations with JV partners, shareholders, financiers and regulatory bodies and have draft agreements prepared for signature on receiving approval for project implementation.
DEVELOP MINING OPERATING COST ESTIMATE
To establish detailed estimates of the overall operating costs development from first principals, based on costs of consumables and services established by the basic design of the selected mining method, metallurgical process, infrastructure, services, staffing structure and remuneration system.
Mining cost estimates of the selected mining method from first principals
Contract mining estimates and tenders
DEVELOP MINING CAPITAL COST ESTIMATE
To establish a detailed cost estimate (-5% +10) developed from the equipment and construction estimates in the selected mining method, metallurgical process and infrastructure.
Equipment requirements
Equipment replacement schedules
Capital cost and capital replacement schedules
DEVELOP MINING COST AND BUDGET FORECAST
To prepare a mining budget forecast for cashflow purposes
Owner operator mining cost estimate and budget forecast
Contract mining cost estimate and budget forecast
× ENVIRONMENTAL STUDY PERMITTING
To conduct a detailed Environmental impact study to a level that will enable the necessary authorisation and permits.
× PROJECT FINANCING
To establish the most favourable conditions for the Group to conclude financing agreements while ensuring that the financial risk is optimally distributed.
× FINANCIAL EVALUATION
To establish an estimate of the return on investment with a high degree of confidence.
× RISK ASSESSMENT
To evaluate in depth the risk profile of the project venture.
FEASIBILITY STUDY REPORT
Report writing.
Geological and mining feasibility study report
|
|
OREBODY EVALUATION
Geological structure
Orebody modeling
Evaluation of reserves
Verification of reserves
Whittle - Pit Optimisations
MINING METHOD
Mine designs
Mine plans
Fleet simulations
Fleet productions
Ore grade scheduling
Manpower requirements
MINING TYPE
Contract mining estimate
Owner mining estimate
Contract enquiries
Equipment enquiries
PRODUCTION SCHEDULING
Ore grade and mine blocks
MINE LAYOUTS
Route selections and designs
MINING EQUIPMENT
Equipment schedules
Equipment specifications
Maintenance schedules
MANPOWER
Operational management requirements
PERMITS
no service
IMPLEMENTATION PLANNING
Scheduling of engineering activities
Procurement strategy
LEGAL AGREEMENTS
no service
OPERATING COST
Operating cost estimate
Contract mining cost estimate
CAPITAL COST
Equipment lists
Equipment replacement schedules
Capital costs and replacement
MINING COST & BUDGET FORECAST
Mining cost estimates
Mining budget forecasts
ENVIRONMENTAL STUDIES
no service
PROJECT FINANCING
no service
FINANCIAL EVALUATION
no service
RISK ASSESSMENT
no service
STUDY REPORT
Geological and mining study report
|
|
| |
|