ENGINEERING PHASE - ENGINEERING |
|
TACMIN SERVICE OFFERING SUMMARY |
|
× PROJECT TEAM INTEGRATION
To ensure that all the team members and contractors are fully aware of the project objectives and philosophies and each discipline and individual is aware of its responsibility to be achieved within a specified time frame and cost.
× DEFINE PROJECT CONTROL PHILOSOPHIES & PROCEDURES
To ensure that appropriate procedures and mechanisms are in place to effectively manage the project.
ENGINEERING
To complete the detailed engineering design in all the disciplines to the specified standard, and identify equipment, plant and material required to be purchased, fabricated, erected, installed and commissioned.
Geological Modeling
Pit Optimisations
Mine Design
Mine Layouts
Fleet selections
Equipment specifications
Drill and blast designs
Manpower requirements
PLANNING AND SCHEDULING
To ensure that activities are all carried out in sequence and according to schedule to ensure project completion within the time, while maximising the utilisation of manpower and machinery resources.
LOM Plans
Annual plans
Production scheduling
Fleet productions
Fleet allocations
× ENGINEERING MANAGEMENT
To control the progress of design and production of design drawings according to schedule, to the correct standards and specification within the cost and man-hours allocated.
PROCUREMENT AND MATERIAL MANAGEMENT
To ensure that plant, equipment, materials and services are obtained timeously and cost effectively.
Owner Operator Mining
Mining fleet selections and comparisons
Mining fleet enquiry documents
Owner operator equipment and manpower requirements
Owner operator mining cost
Equipment replacement schedules
Drill and blast designs, analysis and requirements
Contract Mining
Contract mining enquiries
Contract mining estimates
Shadow Bids
Contract Agreements
Tender documents
Special conditions and specifications
Comparisons
Contract mining vs Owner operator trade-off studies
GENERAL MANAGEMENT
To establish management systems and agreements, and define working interfaces between the project management systems and final administration and control systems that will be used during the production phase.
Manpower structure
Staffing of operations
OPERATIONS MANAGEMENT
To develop the various operations plans and schedules to ensure a controlled ramp up to full scale production.
Finalised mining plans for implementation
Mining costs and budgets for implementation
Standard Operating Procedures
Contract mining scope and specifications
Equipment maintenance systems
Mine engineering maintenance systems
|
|
INTEGRATION
no service
CONTROL PROCEDURES
no service
ENGINEERING
Geological modeling
Pit optimisations
Mine designs
Mine layouts
Fleet selection
Fleet productions
Drill and blast designs
Manpower requirements
PLANNING & SCHEDULING
LOM Plans
Annual Plans
Production Scheduling
Fleet simulations
Fleet allocations
ENGINEERING MANAGEMENT
no service
PROCUREMENT
Owner operator mining
Equipment requirements
Enquiries for mining equipment
Owner operator and manpower
Owner operator mining cost
Equipment replacement schedules
Drill and blast designs
Contract Mining
Contract mining enquiries
Contract mining estimates
Shadow Bids
Contract agreements
Tender documents
Specifications
Comparisons
Contract mining vs Owner operator
GENERAL MANAGEMENT
Manpower
Staffing of operations
OPERATIONS MANAGEMENT
Mining plans for implementation
Budget forecasts for implementation
Standard Operating Procedures
Contract mining scope and specifications
Equipment maintenance systems
Mine engineering systems
|
|
| |
|